Navigating the Next Generation IACMAC

11 min read

The Department of War (DoW) is looking for the nation’s best research talent to solve the warfighter’s toughest problems with speed. That’s the government’s initiative for the Next Generation (NEXTGEN) Information Analysis Centers Multiple Award Contract (IACMAC) (which has also been referred to as “IACMAC 2.0” since it is a follow-on to the current IACMAC vehicle).

Like its predecessor, this vehicle is designed to connect customized research and development (R&D) with the reporting, sharing, and reuse of scientific and technical information (STI). The focus is a faster, more open vehicle built around performers, with clear pools, clear criteria, and a clear timeline. Here are some key insights as we wait for the draft RFP.

What is NEXTGEN IACMAC IDIQ?

The Office of the Assistant Secretary of War for Critical Technologies (OASW CT) is partnering with the Defense Technical Information Center (DTIC) to sponsor the NEXGEN IACMAC.  IACMAC, the current contract, provides customized R&D services to hundreds of mission-critical activities throughout the DoW. The IACMAC is the only DoW contract that requires the production of STI deliverables. Awardees are mandated to report and share new STI during Task Order (TO) performance so that others can reuse STI across the government (source: SAM.gov).

The NEXTGEN IACMAC will be one of the few FAR-based vehicles to support DoW R&D initiatives.

Fast Facts

Solicitation NumberTBD – NEXTGEN IACMAC RFI SAM.gov
Contract Ceiling$160B (yes, that’s billion)
Period of Performance (PoP)10-year ordering period, up to 48-month TO PoPs
Customer AgenciesCombatant Commands, DoW labs, service branches, other defense and federal agencies
Competition TypePool 1: Full and Open, Unrestricted Pool 2: Small Business Set-Aside
Evaluation MethodPhase 1: Pass/Fail Phase 2: Subjective Ratings
NAICS541715
# of AwardsThere’s no predetermined limit on the number of awards – DTIC intends to make awards to all qualified offerors
Anticipated TO Award Type(s)Cost Plus Fixed Fee (CPFF) and Firm Fixed Price (FFP)
TO Award TimelinesAward TOs within five months (from requirements to award); award projects on existing TOs in under one month
Pricing RequirementsN/A – there’s no Cost Volume requirement for the IDIQ
Proposal Timeline – Key Dates*         *all dates are subject to changeSources Sought RFI Released: Oct.6, 2026Industry Day: Oct. 30 (in person); Nov. 4 (virtual)Tentative Draft RFP Release: Nov. 20, 2026Industry Feedback Due: Nov. 30, 2026Tentative Final RFP Release: On or around Dec. 14, 2026Tentative Proposal Due Date: Feb. 1, 2027Proposed Award Date: June 24, 2027 All proposed dates are targets and are subject to change
Minimum Contract ObligationN/A
On RampsAnticipated based on needs of the program and size/participation factors. Bidders may also graduate from Pool 2 to Pool 1.
TeamingPermitted at the TO level only

Scope and Areas of Interest

The scope of NEXTGEN IACMAC will be layered and focused on six Critical Technology Areas (CTAs) identified by the DoW as top priorities (source). Each CTA will have associated Technical Focus Areas (TFAs) that further define the technical scope.

Together, the CTAs and their associated TFAs will make up Layer 1 of the proposed scope structure. At the Industry Day, the government said that the CTA/TFA crosswalk is still being developed and is expected to be included with the draft RFP.

CTAPlanned Number of TFAs
Applied Artificial Intelligence (AAI)6
Quantum & Battlefield Information Dominance (Q-BID)6
Contested Logistics Technologies (LOG)6
Scaled Hypersonics (SHY)5
Scaled Directed Energy (SCADE)6
Biomanufacturing (BIO)6

Layer 2 consists of Foundational Areas that cut across and support the CTAs:

  • Modeling and Simulation (M&S) & Digital Engineering
  • Cybersecurity
  • Software, Data, and Knowledge Management
  • Autonomous and Unmanned Systems
  • Command, Control, Communications, Computers, Intelligence, Surveillance, and Reconnaissance (C4ISR) and Sensing
  • Weapons, Energetics, and Survivability
  • Advanced Materials
  • Reliability, Maintainability, Quality, Supportability, and Interoperability (RMQSI) and Test/Evaluation
  • Chemical, Biological, Radiological, Nuclear, and Explosives (CBRNE) and Weapons of Mass Destruction (WMD) Defense
  • Biometrics
  • Medical & Human Performance

Unlike the CTA-specific structure in Layer 1, Foundational Areas are broader and intended to support multiple CTAs. This gives the vehicle flexibility to address capabilities that may cut across multiple CTAs rather than fit neatly under a single CTA.

What Does My Proposal Need?

Each proposal response will include three distinct volumes. Some qualification requirements will vary depending on whether you’re proposing Pool 1 or Pool 2. Importantly, based on the Industry Day, prime offerors should be prepared to meet these requirements with their own qualifications, experience, clearances, and certifications; experience from teammates will not be considered.

Mandatory Requirements

  • Small Business Participation: Based on obligated dollars
  • Facility Clearance Level (FCL): Interim or Top Secret
  • Responsibility Determination: Financial, NIST, Supplier Performance Risk System (SPRS), Subcontracting Plan, SAM/Federal Awardee Performance/Integrity Information System (FAPIIS)
  • Approved Purchasing System: (Anticipated for Other Than Small Businesses [OTSB] Only)
  • Approved Accounting System: Only applicable to Pool 1; however, bidders without an approved accounting system may be limited to FFP TOs under current requirements; an approved accounting system may be required for CPFF awards under the current requirements.
  • Certifications:
    • CMMC level II – Self-certification is planned as a MAC-level requirement
    • Individual TOs may require certifications such as ISO 9000; relevant certifications may also be considered a strength during evaluation

Past Performance

The number of references you will need to submit will depend on whether you are bidding in Pool 1 (OTSBs) or Pool 1 (SBs). Pool 1 offerors must provide past performance for a minimum of two CTAs, and Pool 2 offerors must provide a minimum of one. Past performance submissions must align with each CTA selected for qualification, and bidders are required to separate submissions for each CTA and identify the applicable TFAs in the report. We expect this means you can use a singular reference to cover multiple CTAs, but each CTA will require its own individual write-up.

An important note is that IDIQ references will not be accepted as proven experience in the delivery of a technical innovation. Bidders must provide the underlying TO that demonstrates the work performed rather than citing the overarching IDIQ as the past performance reference. Your past performance must show that you, as the offeror, completed the work. If you’ve completed work on a project similar in scope to NEXTGEN IACMAC, the government recommends prioritizing that experience. For non-traditional defense contractors (NTDCs) and academia who may bid, the government confirmed that non-government past performance references will be accepted.  

Technical Approach

Similar to past performance submissions, your technical approach must align with your chosen CTA. Each CTA will have an associated scenario response, but offerors are not required to propose against all CTAs.

  • Pool 1: Provide a scenario response for a minimum of two CTAs or respond to the BIO CTA and provide evidence that you meet the lab requirements
  • Pool 2: Provide a scenario response for a minimum of 1 CTA
    • The government is considering an alternative qualification pathway for offerors with recent SBIR/STTR experience

Award Evaluation

The government is considering a two-phased award strategy:

  • Phase 1: Acceptable/Pass screening of Mandatory Requirements
  • Phase 2: Review of responses to project-based scenarios and evaluated past performance/experience

At the government’s Industry Day, it was noted that they intend to award all qualifying offerors. “Qualifying” means that your Past Performance rating must be “Substantial” on the minimum number of CTA response(s) and your Technical Approach rating must be “Good” or “Outstanding” on the minimum number of CTA response(s). We’re watching this closely, but based on the Industry Day, it does not sound like awardees will only be eligible to compete in the CTAs they respond to. This means you should prioritize selecting references that highlight the quality and capability you can deliver, not necessarily the breadth of CTAs/TFAs you can cover with past performance.

On- and Off-Ramps

On-Ramp

The government has confirmed that it may offer on-ramp opportunities at its discretion. These include:

  1. New offerors who submit SBIR/STTR work to qualify
  2. Single on-ramp from Pool 2 to Pool 1: A Pool 2 contractor that outgrows its small business status may have an opportunity to move into Pool 1 by meeting the Pool 1 qualification requirements or potentially demonstrating a threshold of successful Pool 2 performance
  3. Defined scope specific on-ramp: The government may conduct an on-ramp for a specific CTA/TFA or other area where additional contractor capability or competition is needed.
  4. Full-scope on-ramp: The government could reopen the broader Performance Work Statement (PWS) scope to bring additional contractors onto the vehicle.

Off-Ramp

Contracts may need to be off-ramped in certain circumstances. These include:

  1. Mergers and acquisitions
  2. Failure to meet TO win rates or submission/participation minimums
  3. Awardee non-responsiveness (e.g., failure to provide no-bid responses to Fair Opportunity Proposal Requests [FOPRs])
  4. Technical performance degradation (e.g., marginal or unsatisfactory CPAR outcomes)
  5. Pool 2 awardees who lose SB status: those with no TOs will be off-ramped, and those with TOs will be off-ramped at the end of the TO PoP

Who are the Buyers?

The government’s Industry Day highlighted current IACMAC buyers. They span the service components, “other DoD” and “other Gov’t”. Here’s the breakdown provided by the government:

ServiceTotal Funded ($)# AwardsTotal Ceiling Value Awarded ($)Unique Orgs
Navy$7.15B124$12.09B106
Air Force$3.63B86$6.66B429
Army$3.07B72$5.13B230
Other DoD$2.07B52$3.87B75
Marine Corps$1.93B15$2.28B49
Other Gov’t$0.35B7$0.69B29
Space Force$0.29B4$0.33B30

The above breakdown covers awards, but take a look at which CTAs below receive the most attention. Many TOs cover multiple CTAs rather than aligning to just one, and that is a trend we expect will continue with NEXTGEN IACMAC.

Multiple/Cross-cutting32.4%
AAI30.5%
Q-BID17.1%
LOG11.4%
BIO4.8%
SHY1.9%
SCADE1.9%

IACMAC vs. NEXTGEN IACMAC

The government wants to broaden who can bid on the TOs. To increase the bidding pool, DTIC and OASW CT have created intentional pathways for SBs, NTDCs, and SBIR/STTR performers to bid.

NEXTGEN no longer has a specialized Pool 3 (Chemical, Biological, Radiological, and Nuclear Lab). If this applies to you, don’t worry – lab requirements will be addressed at the TO level so you can still bid. Companies with certified labs can qualify by providing evidence of such certification and responding to the BIO CTA.

Rather than taking a one-size-fits-all approach, the government established two distinct Pools to better align requirements with qualified technical performers. They also streamlined the TO award process with the goal of getting awards out the door in five months or less.

Who should bid on this?

The NEXTGEN IACMAC is a strong fit for companies doing real-world R&D for defense customers. This includes Large Businesses, SBs, NTDCs, and SBIR/STTR performers. If you innovate, this is a contract you should consider. Now is a good time to evaluate whether this vehicle aligns with your capabilities and growth strategy.

Getting Started

Be proactive, not reactive

Get your ducks in a row now so that you’re prepared when the draft RFP is released. Have you formed your proposal team and assigned responsibilities? Do you have a document repository established and ready to go? Have you organized your past performance references, and do you have copies of all your CPARs? Have you researched the CTAs and TFAs? Working ahead always puts your team in a strong position. Have you considered third-party compliance checks and graphics support? Contact Trident to see how our team can support your efforts.

Things to Be Aware Of

There are some nuances of the NEXTGEN IACMAC that may not be obvious. Here are a couple of things to think about while we’re waiting for the draft RFP to be released:

  • Broad CTA coverage may not be your best strategy. Simply having contract experience may not be enough to win. Companies will likely need to be able to demonstrate technical depth and positive performance to be considered for an award. This is why it’s so important to identify your CTA alignment before the RFP is released. And it seems like this will definitely be a case of quality over quantity.
  • Team with caution. In perhaps the biggest departure from the original IACMAC, DTIC will only consider experience from the Prime offeror. They don’t want to see large teams assembled to win an IDIQ; DTIC is more concerned with identifying companies with legitimate capabilities.
  • Facility clearances and infrastructure may become discriminators. The ability to execute specialized R&D may be a barrier for some companies. Most DoW R&D efforts require secure facilities, cleared personnel, specialized labs, or unique testing environments. Companies that already have these capabilities may have a competitive advantage.

If you’d like help preparing your NEXTGEN IACMAC proposal, click here to contact us about support. To help prepare companies for their bids, Trident is hosting a two-part webinar. Sign up today and bring your best questions:

  • NEXTGEN IACMAC: Breaking Down the Draft RFP
  • NEXTGEN IACMAC: The Final RFP
    • Thursday, Dec. 17, 4 p.m. ET; sign up here
      • Important Note: If the Final RFP is not released by Dec. 16, this webinar date will shift. Registered attendees will be notified of the new day/time.

Written by Jen Concannon with support from Karen Haddock

Jen is a capture and proposal manager at Trident. Her skills include proposal support, technical editing, and formatting. She is also a licensed program management professional (PMP). As a military spouse based on the East Coast, she supports clients around the world as part of our globally dispersed team.

Karen is a proposal manager at Trident Proposal Management and a former U.S. Army Officer with extensive experience in project management, logistics, and education. Based on the East Coast, she supports clients around the world as part of our globally dispersed team. 

Share It

About the authors

Jen Concannon

Jen is a capture and proposal manager at Trident. Her skills include proposal support, technical editing, and formatting. She is also a licensed program management professional (PMP). As a military spouse based on the East Coast, she supports clients around the world as part of our globally dispersed team.

Karen Haddock

Karen is a proposal manager at Trident Proposal Management and a former U.S. Army Officer with extensive experience in project management, logistics, and education. Based on the East Coast, she supports clients worldwide as part of our globally dispersed team.